Glenfiddich Long Term Plan
Glenfiddich Long Term Plan navigation
Forestry and Land Scotland is preparing a new Long Term Plan (LTP) for Glenfiddich Forest, located in Moray to the south of Dufftown within the upper River Spey catchment. The plan area includes the Glenfiddich, Blackwater and Morinsh forest blocks.
The plan will guide forest management over the coming decades and set out how the forest will continue to deliver sustainable timber production alongside environmental, biodiversity, access and landscape benefits. Information on the forest, proposed management objectives and the developing concept for the plan can be found in the consultation documents.
The draft vision is for Glenfiddich to remain a resilient and productive forest that provides a sustainable supply of timber while delivering wider environmental, biodiversity and community benefits. Productive conifer woodland will continue to be the principal land use, supported by a more diverse age structure and species composition that is increasingly matched to site capability and future climate resilience. Opportunities will be taken to enhance riparian habitats, strengthen habitat networks, expand native woodland, review open habitats, deliver peatland restoration where appropriate and improve the long-term resilience of the forest. Particular consideration will also be given to the future management of Blackwater, balancing forestry, peatland restoration, access and deer management objectives.
We are asking stakeholders, including statutory bodies, third sector organisations, businesses, neighbouring landowners, local communities and individuals, to share their thoughts on how the Glenfiddich LTP should be managed over the next 10 years. Feedback will help us develop a plan that balances productive forestry with biodiversity enhancement, habitat restoration, environmental protection, recreation interests and the long-term needs of local communities.
If you'd like to send us your feedback but are not sure where to start, you could think about the following questions:
- what is your connection to this place?
- why is this place important to you?
- is there a significant feature or issue we should know about?
- do you have a private water supply which is located within or nearby the forest?
Renaming Land Management Plans as Long Term Plans
Land Management Plans are in the process of becoming known as Long Term Plans, a change needed as a result of changes taking place in legislation.
The Land Reform Act introduces an alternative use for the term Land Management Plan which relates specifically to the forthcoming obligations set out under this banner. These terms are used interchangeably on our website, but both currently reference our plans developed in line with the UK Forestry Standard.
Location
Key proposals
The Long Term Plan is expected to:
- Continue sustainable timber production through harvesting and restocking of productive woodland, while creating a more balanced and resilient age structure across the forest.
- Improve forest resilience by matching future species choice more closely to site capability, increasing the use of Scots pine, native species and other suitable woodland types where appropriate.
- Develop a long-term management strategy for Blackwater, considering the balance between timber production, peatland restoration, deer management and access requirements.
- Enhance burns, riparian habitats and the wider water environment through the removal of non-native regeneration and expansion of native woodland along watercourses.
- Improve habitat connectivity through native woodland creation, open habitat management and the strengthening of ecological networks across the forest.
- Deliver approved peatland restoration at Restocknach and identify further areas where peatland restoration or alternative land uses may provide environmental and operational benefits.
- Review and rationalise existing open habitat networks to ensure they continue to support biodiversity, landscape quality and deer management objectives.
- Protect key environmental, cultural heritage and landscape features through sensitive forest design, woodland restructuring and long-term management planning.
- Maintain responsible public access and take account of recreation interests, including routes associated with the historic Battle of Glenlivet and other established access routes.
- Assess opportunities for strategic road and bridge improvements where these would support sustainable forest management, timber production, habitat restoration and deer management objectives.
Drop-in sessions
We will be running a drop in session at Glenrinnes Community Centre on the 27th January 2027, 4.30pm to 7.30pm.
Timeline
- November/December 2026: initial scoping, including public consultation (28 days)
- December 2026/February 2027: preparation of the draft plan
- February 2027/March 2027: final stakeholder scoping and public consultation on draft proposals, preparation of the final plan.
- March 2027: submission to Scottish Forestry for approval
- Summer 2027: approval and adoption of new LTP expected
Documents and maps
Get in touch
If you would like further information or have any questions about this plan, please contact:
Email: enquiries.east@forestryandland.gov.scot